[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index] Re: bomb recharge procedure???
>Anyway, when folks talk of the bomb being at 2000 psi I guess that means >its _initial_ pressure; and that new bombs are shipped dry (empty of >hydraulic fluid) at first? If so, the "membrane" needs to be pretty rigid >to be able to retain that initial nitrogen charge against merely >atmospheric pressure (?). I hadn't thought about that before this thread. the "membrane" needs to be flexible enough to stretch to the opposite wall until a sufficient quantity of incompressible fluid (hopefully pentosin) is pumped into the empty side of the chamber... frank to: IN:pjrose@servtech.com cc: IN:quattro@coimbra.ans.net
|